Flood Protection Infrastructure Construction and Riverbank Stabilization Works
Briefly, the works include: � A contractor�s methodology that will ensure construction of the works is such that they are able to reinstate the level of flood protection to match the level of existing flood protection should the 3 day forward weather forecast predict the risk of flooding; � Protection and maintenance o…
Source ID: NZ-GETS-24002946
Scope overview
Briefly, the works include: � A contractor�s methodology that will ensure construction of the works is such that they are able to reinstate the level of flood protection to match the level of existing flood protection should the 3 day forward weather forecast predict the risk of flooding; � Protection and maintenance of access and servicing for existing residential properties; � Topsoil stripping and stockpiling; � Excavation and removal of sections of existing stopbank; � Removal of the existing stormwater pipe and structure; � Carefully de-construct the concrete flood wall and any other buried hard engineered structures and dispose off-site � Trim the stopbank ends in preparation to tie in the new stopbank; � Construction of new stopbank on the proposed alignment; � Construction of new sheet pile wall as part of new stopbank works; � Rock riprap work beside the river where disturbed by the Works; � Road widening including new kerb and channel; � New PE stormwater pipe to river including penetration through the sheet pile wall, wingwall, flap gate and scour works; � New stormwater pipes, catch pits and wingwalls; � Reshaping of the existing swales; � Top soiling and grassing of site; � Reinstatement of all affected surfaces; � Clearing and tidying of the total site; � Preparation and submission of as-built drawings; � Associated project management and site supervision traffic management, erosion and sediment control including de-watering, survey setout; � Other miscellaneous items described or implied in the specifications or drawings.
Buyer & contacts
Tags & Signals
Similar tenders
Bridge Construction Project to Replace Culverts on Smith Road
The Bay of Plenty Regional Council seeks a qualified civil construction contractor to replace two culverts on Smith Road with a single-span bridge using concrete T-beams. The project involves constructing a new bridge and road, implementing sediment and erosion controls, and managing traffic during the works. A staging plan must ensure flood protection, channel flow, and property access are maintained throughout construction.
Avon Park Redevelopment Project in Otakaro Avon River Corridor
This project involves the comprehensive redevelopment of Avon Park within the Otakaro Avon River Corridor. Key elements include significant earthworks for flood protection, removal of existing infrastructure, and construction of recreational facilities. The work encompasses landscaping, installation of stormwater assets, and creation of community amenities like playgrounds and sports courts.
Engineering Services Sought for Kaituna River Stopbanks Seepage Analysis
The Bay of Plenty Regional Council is requesting proposals for engineering services to conduct seepage analysis on Kaituna River stopbanks. This project falls under an existing panel agreement for geotechnical engineering specialists. The work will involve analyzing seepage conditions at proposed investigation locations along the river's flood protection structures.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.