Replacement of Failed Timber Retaining Wall on Roadway
This proposal is to replace old dilapidated failed 26-metre long wall. The wall is 40 years old. Following are the reasons for replacement. �most timber poles rotated out, �severe scour between poles, the foundation failure. �Longitudinal crack on the carriageway surface indicated that road has settledbecause of wall f…
Source ID: NZ-GETS-25553579
Scope overview
This proposal is to replace old dilapidated failed 26-metre long wall. The wall is 40 years old. Following are the reasons for replacement. �most timber poles rotated out, �severe scour between poles, the foundation failure. �Longitudinal crack on the carriageway surface indicated that road has settledbecause of wall failure. TTM signs are in place for safety.
�If the condition aggravated due to another weather bomb, may cause one lanetraffic closure similar to the one had at #226 Forest Hill Rd. �Missing secoundary timber plank
Buyer & contacts
Tags & Signals
Similar tenders
Replacement of Timber Retaining Wall and Pavement Works on Hibiscus Coast Highway
This procurement involves the replacement of a timber pole retaining wall along approximately 52 meters of the Hibiscus Coast Highway, including associated pavement reinstatement and carriageway works. The project aims to maintain a safe and efficient roading network through structural improvements. Earthworks and vegetation alterations will be conducted under specialist supervision as part of the required construction activities.
Footpath Construction Project on Richmond Hill Road Section
This tender involves constructing a separate footpath along a specific section of Richmond Hill Road, from the second hairpin bend to a vehicle entrance. The works include installation of kerb and channel, road shoulder improvements, timber retaining walls, concrete driveways, footpaths, landscaping elements, and necessary traffic and environmental management. The project requires coordination of service alterations and fencing modifications to accommodate the new infrastructure.
Timber Retaining Wall Construction for Berm Stabilization
This contract involves constructing a timber cantilever retaining wall to address a slip in the berm adjacent to Maritime Terrace. The project includes installation of a safety fence and reinstatement of the footpath. The work aims to stabilize the area and restore safe pedestrian access.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.