ADDENDUM #3 1/9/26 RFI #2 1. Is the 2 hour on site requirement for Emergence call a must have? a. Yes. These are back-up generators that need to be operational within 2hrs or less as IT equipment switches to battery back-up which only lasts for a very short time with the heavy data center load. 2. Can you clarify the Testing requirements for the Load Banking of each generator ?
Load Percentages and time for each level a. This is outlined within PWS para 4.1.5.1 i. 30 minutes at 20% of rated load of genset. ii. 30 minutes at 50% of rated load of genset. 3. Are there different requirements for each generator? a. No, generators are all Caterpillar and follow the same type of load bank testing. 4. How often does the Load Testing happen, and what time of year? a.
This is outlined with PWS para 4.1.5.1 i. Annual load bank test 5. Doing the Advantage ESC, witch CAT Dealership does the report get sent to? a. Once the vendor performs services, they return to their office to finalize the service and send a copy to our facilities management team and the COR.
This action usually takes them less than 2-3 days (depending on workload) END ADDENDUM #2 1/8/26 An updated Combined Synopsis has been posted. END ADDENDUM #1 1/6/26 RFI #1 1. Could you please confirm whether this is a new requirement? If not, we kindly request the incumbent contractor’s name and the previous contract number. a.
Expand full description
This action is a follow-on requirement Contract number: W91QF0-21-P-0040 Contract Awardee: Virginia Energy & Lighting, LLC. Description of requirement: Caterpillar Diesel Standby Generator Preventive Maintenance (PM) and Emergency Repair Services (ERS) Method of procurement: Set-Aside Small Business Contract type: Firm-Fixed Price Number of option periods: 4 2.
Additionally, are there any notable changes to the scope of work compared to the prior award? a. The scope of the contract has changed significantly since the previous award. Key additions include annual Advantage Extended Service Coverage (ESC) certification inspection, load bank testing, battery replacement, consumable parts replacement, and fluid sampling and testing services.
These enhancements were introduced to address the requirements brought about by upgraded equipment, improved maintenance procedures, the need for additional coverage for new assets, and expanded preventive maintenance services.
Incorporating fluid sampling also helps prevent equiopment damage, making the new contract more comprehensive and cost-effective by consolidating service that were previously sourced separately at higher expense. END This is to confirm that the site visit for the requirement is scheduled for January 7, 2026, at 0900 AM.
Please confirm by email to Myrisha Mullen @ myrisha.l.mullen2.civ@army.mil , if you will be in attendance. Please find attached the following documents for your reference: Performance Work Statement (PWS) Combined Synopsis CLIN Structure Additionally, please note that the deadline for submitting questions is January 9, 2026, at 1500 PM.
Buyer & contacts
Documents
Tags & Signals
Similar tenders
Emergency Generator Repair Contract Awarded for Facilities Management
A new contract has been awarded for the repair of emergency generators. The contract covers power generation and distribution machinery and accessories. The award amount is $607,500 with a three-year term.
Emergency Generator Repair Services Contract Award
The Department of Facilities Management has awarded a formal bid contract for emergency generator repair services. The procurement exceeded the $25,000 threshold requiring formal bidding procedures. The contract was awarded to Alta Equipment following the competitive bidding process.
Town of Chestertown Seeks Outdoor Propane Generator for Delivery
The Town of Chestertown is procuring a 38-42 kW three-phase outdoor propane-fueled electricity generator. The purchase includes delivery services only, with no installation to be provided by the supplier. This procurement is currently in progress as part of municipal infrastructure improvements.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.