Construction of Heaphy and Lewis River Swing Bridges in Kahurangi National Park
DOC intends seeking a contractor to undertake the supply and construction of the proposed 93m long Heaphy River Swing bridge and the 101m long Lewis River Swing Bridge, Heaphy Track, Kahurangi National Park. The bridge sites are located within 400m of each other at the junction of the Heaphy and Lewis Rivers. The work…
Source ID: NZ-GETS-27147616
Scope overview
DOC intends seeking a contractor to undertake the supply and construction of the proposed 93m long Heaphy River Swing bridge and the 101m long Lewis River Swing Bridge, Heaphy Track, Kahurangi National Park. The bridge sites are located within 400m of each other at the junction of the Heaphy and Lewis Rivers. The work includes the construction of three sets of approx.
6-9m deep rock anchors, concrete Deadman anchor, concrete tower foundations, tower installations, timber access ramp, and cable swing bridge constructions. The site can be accessed via the Heaphy Track, approximately 25km from the Kohaihai road end, Karamea (4-5 hours walk or 1.5 hours electric motorbike). The contractor may use mountain bikes, motorbikes and/or electric bikes to provide site access.
For the duration of the construction period, the contractor will be given full use of the Heaphy Staff quarters hut located approximately 30minutes from the proposed Heaphy bridge site. The contractor shall also be given full use of the recently constructed Lewis Emergency shelter located on the true left of the Lewis river.
The contractor for the proposed work shall be sought via Request for Tender via the Government Electronic Tender System (GETS). Tenderers shall be required to partake in a mandatory site visit to be held during the tender period.
Buyer & contacts
Tags & Signals
Similar tenders
Swing Bridge Construction Tender for Multiple South Island Tracks
This tender covers the construction of five swing bridges across three separate work packages on South Island tracks. The packages include bridges at Edwin Burn, three locations on the South Coast Track, and Rough Creek on the West Matukituki Track. Contractors may bid for individual packages or combine them in their submission.
Replacement Cable Swing Bridge Construction at Totara Flats
A new cable swing bridge will be constructed upstream from the existing Totara Flats Bridge, which is scheduled for replacement. The new structure will span approximately 90 meters and have a load capacity for up to five people. This project involves replacing the aging infrastructure with a modern pedestrian crossing.
Pedestrian Swing Bridge Construction for Remutaka Cycle Trail
This tender involves constructing a 90-meter pedestrian swing bridge across Siberia Stream to enhance the Remutaka Cycle Trail infrastructure. The project aims to improve trail connectivity and accessibility for cyclists and pedestrians. The bridge will be designed to accommodate trail users while blending with the natural environment.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.