Public data workspaceRead-only tender record
Public tender

Hydrology and Hydraulics Expert Sought for Dam Safety Panel in Lebanon

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – INDIVIDUAL CONSULTANT SELECTION) REPUBLIC OF LEBANON, Litani River Authority (LRA) Lebanon Renewable Energy and System Reinforcement Project (P180501) Loan No.: IBRD-LB-9731 Assignment Title: Hydrology/hydraulics Expert (DSPOE) Reference No. (as per Procurement…

Source ID: WB-OP00425855

Estimated value

$100,000

As published by the source; may be updated by the buyer.

Scope overview

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – INDIVIDUAL CONSULTANT SELECTION) REPUBLIC OF LEBANON, Litani River Authority (LRA) Lebanon Renewable Energy and System Reinforcement Project (P180501) Loan No.: IBRD-LB-9731 Assignment Title: Hydrology/hydraulics Expert (DSPOE) Reference No. (as per Procurement Plan): LB-LRA-513071-CS-INDV

  • BACKGROUND

The Ministry of Energy and Water (MOEW), through the Electricité du Liban (EDL) and the Litani River Authority (LRA), is implementing the Lebanon Renewable Energy and System Reinforcement Project (P180501), funded by the International Bank for Reconstruction and Development (IBRD). The project aims to strengthen Lebanon’s electricity infrastructure through grid modernization, hydropower rehabilitation, and improved sector governance. Within this framework, the LRA is responsible for Component 2.2: Rehabilitation of the three Hydropower Plants (AbdelAl, Awali & Joun) and works to improve QARAOUN Dam Safety .

  • OBJECTIVE OF THE ASSIGNMENT

The Client (LRA) intends to appoint a Dam Safety Panel of Experts (DSPOE) for the Project to advise on dam safety assessment for Qaraoun dam, and other technical issues. who will be directly contracted by the LRA on a needs-driven basis. The general task of the panel is to review all relevant design, engineering, construction and dam safety aspects. The members of DSPOE will be selected by the Client based on the required skill-mix. The members will constitute a group of high-level, internationally-recognized professionals. These Terms of Reference (TOR) address the specific scope of work for the Hydrology/hydraulics Expert

  • Scope of Work of Hydrology & Hydraulics expert

The primary tasks of the Hydrology & Hydraulics expert of the DSPOE will include, but not necessarily be limited to the following:

  • Review the hydrological and hydraulic engineering aspects of the design reports for the rehabilitation works on Qaraoun , as relevant.
  • Review the scouring assessment of the plunge pool, including previous numerical and physical model studies, as well as the rehabilitation design concept for controlling the plunge pool scouring.
  • Review the design criteria and specifications of the plunge pool reshaping works from hydraulic / scouring engineering perspective, as well as drawings and construction plans.
  • Review the hydraulic design of the spillway gates, including new upstream emergency gates and downstream flood gates, as well as hydraulic profile under various operating conditions.
  • Review the criteria, methodology and adequacy of design flood, flood routing study, and spillway capacity and recommend measures if any.
  • Review and advise on integration of climate change projections into hydrological and flood analyses, testing design floods, spillway capacity and reservoir operating rules across plausible future scenarios.
  • Review the overall reservoir operational rules for flood control and power generation including operational records (reservoir water level, inflow, discharge volume, etc.) and hydrological /meteorological monitoring data.
  • Review the overall construction plan and the discharge for selected return periods of both upstream and downstream cofferdam arrangements from hydrological and hydraulic aspects.
  • Recommend additional actions and measures to assure the safety of the dam’s design and construction plan considering potential hydrological / hydraulic risks and required safety level if any.
  • Review the Construction Supervision and Quality Assurance Plan (CSQAP) as it relates to hydraulic structures and hydrometric monitoring, and advise on adequacy and implementation.
  • Review the technical specifications and drawings of the bidding document and provide technical support for the hydraulic design aspects of bidding process, including pre-qualification, bid evaluation, contract negotiations.
  • Review the adequacy of hydro-meteorological monitoring instruments, including their numbers, locations, monitoring frequency, etc.
  • Review the Operation and Maintenance Plan and the Emergency Preparedness Plan or Framework Plan regarding the conditions and operational procedures of the spillway gates and other hydraulic outlet facilities.
  • Review sedimentation issues in the reservoir and management strategy / plan for ensuring long term sustainability if relevant.
  • Review the quality of contractors/suppliers works and construction supervision regarding hydraulic /scouring engineering aspects related to the plunge pool reshaping and manufacturing / installation of the new emergency gates and new set of stop beams and their conformity to their technical specifications.
  • Coordinate with the DSPOE Chair and other panelists to fulfill assignments in the field and his/her home offices. All formal technical advice and reporting to the Client shall be channeled through the DSPOE Chairperson to ensure a single, consolidated panel report.
  • Attend meetings with the client, its consultants (Designer, Owner’s Engineer) and the World Bank to provide independent technical advice as a DSPOE member.
  • Experience and Qualifications Requirements

The Hydrology & Hydraulics expert should meet the following minimum requirements:

  • An advanced degree in Hydrology, Hydraulics, Water Resources or related field or other relevant majors,
  • Minimum 25 years of experience in relevant professional works,
  • Having worked as a hydrologist and hydraulic design expert in designing and construction of large dams including concrete dams, under climate change impact assessment
  • Top notch expertise and experience in rock scouring assessment and energy dissipation design of large dams,
  • Intensive experience in hydrological and hydraulic aspects of construction plan and schedule for large-scale or complex dam projects.
  • Intensive experience of hydrological and hydraulic aspects of dam safety planning, instrumentation and monitoring.
  • DURATION OF ASSIGNMENT

The assignment is expected to cover the entire project implementation period, estimated at three years. The Hydrology/hydraulics Expert (DSPOE) will provide services on a needs-driven basis, in accordance with the Terms of Reference (TOR). The attention of interested Consultants is drawn to Section III, paragraphs 3.13, 3.15, and 3.16 of the World Bank’s Procurement Regulations for IPF Borrowers (Feb. 2025), which set forth the World Bank’s policy on conflict of interest. A Consultant will be selected in accordance with the Individual Consultant Selection method set out in the Procurement Regulations (World Bank’s Procurement Regulations for IPF Borrowers (Feb. 2025)).

  • Submission of Expression of Interest

Interested individual consultants should submit their Expression of Interest (EOI) including:

  • Updated CV demonstrating relevant experience and qualifications.
  • Cover letter outlining suitability for the assignment.
  • At least three references with contact details.

Expressions of interest must be delivered in a written form to the address below (in person, or by E-mail) no later than Mars 26, 2026, at 10:00 a.m. (Beirut Time). Litani River Authority Ghannageh Building, 4th floor, Bechara El Khoury Street, Beirut , Lebanon Attn: Mrs. Grace Ammoury – Head of Procurement Dept. Tel: 961-1-662118 Fax: 961-1-660476 E-mail: gammoury@litani.gov.lb Agency: Litani River Authority Procurement method: Individual Consultant Selection Notice type: Request for Expression of Interest Status: Published Value: 100000.0 USD

Statusopen
CategoryConsultant Services
CountryLebanon
Publish dateFeb 10, 2026
Submission deadlineMar 26, 2026
Estimated value$100,000
Notice typeprequalification
Sourceworld-bank-global
BuyerLitani River Authority
Buyer websitehttps://projects.worldbank.org/
City

Buyer & contacts

Public read-only access
Contact fields are visible publicly. Use the workspace for exports, buyer tracking, and alerts.
Open workspace
Emaillegal.intelligencer@gmail.com
OrganizationLitani River Authority

Documents

Public document access
Source documents are listed publicly. Use the workspace for OCR, search, and one-click packs.
Open workspace
  • Lebanon - MIDDLE EAST AND NORTH AFRICA- P180501- Lebanon Renewable Energy and System Reinforcement Project - Procurement Plan

    Attachment

    Download
  • Lebanon - MIDDLE EAST AND NORTH AFRICA- P180501- Lebanon Renewable Energy and System Reinforcement Project - Procurement Plan

    Attachment

    Download

Tags & Signals

hydrology experthydraulics consultantdam safety panelQaraoun dam rehabilitationLebanon renewable energy projectWorld Bank fundedspillway design reviewflood routing analysis
Unlock actions

Keep reading for free. Pay only when you need workspace actions.

This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.

Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.