Estuary Shoreline Flood Protection Works in South New Brighton and Southshore
The Contract Works are located along the Estuary shoreline of South New Brighton and Southshore and include two Separable Portions. The works have been separated into two Separable Portions as they are in different physical locations, with different designers of the civil works. Separable Portion 1 � Avon Stopbank work…
Source ID: NZ-GETS-20542369
Scope overview
The Contract Works are located along the Estuary shoreline of South New Brighton and Southshore and include two Separable Portions. The works have been separated into two Separable Portions as they are in different physical locations, with different designers of the civil works.
Separable Portion 1 � Avon Stopbank works: a) construction of new 185m long section of Avon Stopbank, south of Bridge Street b) landscape works associated the new Avon Stopbank, south of Bridge Street Separable Portion 2 � Jellicoe Marsh Bund, Temporary Pumping and Erosion Protection works: c) modification and improvement of the existing floodplain protection bund in Jellicoe Marsh d) landscape works associated with the Jellicoe Marsh bund improvements e) construction of gravel access for temporary pumps (two locations) f) installation of manholes on existing stormwater pipes to provide access points for temporary pumping (three locations) g) construction of discrete areas of coastal erosion rock protection for the existing bund on the Estuary edge (two locations)
Buyer & contacts
Tags & Signals
Similar tenders
Bridge Construction Project to Replace Culverts on Smith Road
The Bay of Plenty Regional Council seeks a qualified civil construction contractor to replace two culverts on Smith Road with a single-span bridge using concrete T-beams. The project involves constructing a new bridge and road, implementing sediment and erosion controls, and managing traffic during the works. A staging plan must ensure flood protection, channel flow, and property access are maintained throughout construction.
Avon Park Redevelopment Project in Otakaro Avon River Corridor
This project involves the comprehensive redevelopment of Avon Park within the Otakaro Avon River Corridor. Key elements include significant earthworks for flood protection, removal of existing infrastructure, and construction of recreational facilities. The work encompasses landscaping, installation of stormwater assets, and creation of community amenities like playgrounds and sports courts.
Engineering Services Sought for Kaituna River Stopbanks Seepage Analysis
The Bay of Plenty Regional Council is requesting proposals for engineering services to conduct seepage analysis on Kaituna River stopbanks. This project falls under an existing panel agreement for geotechnical engineering specialists. The work will involve analyzing seepage conditions at proposed investigation locations along the river's flood protection structures.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.