Moteo Stopbank Upgrade Project for Heretaunga Plains Flood Protection
Hawke�s Bay Regional Council (HBRC) are upgrading the existing Level of Service (LoS) for flood protection infrastructure as per HBRC�s Long Term Plan to increase the climate change resilience of Heretaunga Plains. This tender calls for contractors to be involved in delivery of the Moteo Stopbank Upgrade project, which…
Source ID: NZ-GETS-26549603
Scope overview
Hawke�s Bay Regional Council (HBRC) are upgrading the existing Level of Service (LoS) for flood protection infrastructure as per HBRC�s Long Term Plan to increase the climate change resilience of Heretaunga Plains. This tender calls for contractors to be involved in delivery of the Moteo Stopbank Upgrade project, which is part of the LoS Upgrade Programme in the Heretaunga Plains Flood Control Scheme (HPFCS).
This Stopbank project is on the true right bank of the Tutaekuri River, and starts immediately upstream of Vicarage Road and continues for 2,500m+ upstream. The nature of work includes predominantly bulk earthwork, but also require concrete, road (access ways, parking), drainage and river bank protection works (e.g. rip rap installation).
Construction is usually during summer months (October-April) with possibility of works beyond the season at HBRC�s discretion.
Buyer & contacts
Tags & Signals
Similar tenders
Waipaoa Flood Control Scheme Road Elevation Project
This project involves raising sections of Kirkpatrick Road to address low points created by upgraded stopbanks in the Waipaoa Flood Control Scheme. The road will be elevated approximately 1.7 meters on the southern side and 1.2 meters on the northern side near Tietjen's Bridge. These improvements are part of a broader 10-year program to enhance flood protection to a 100-year return period standard while accounting for future climate change impacts.
Construction of New Floodgate Structure and Stopbank Upgrades in Mahunga Stream
This project involves building a new floodgate structure approximately 300 meters downstream of existing floodgates at State Highway 2 in Ormond, along with associated stopbank upgrades to integrate with the adjacent stopbank system. The work includes sheetpile and concrete construction, earthworks, installation of structural components, and stream armouring with rock rip-rap. This initiative is part of a 10-year program to enhance flood protection for the Waipaoa River Flood Control Scheme.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.