Bridge Replacement and Boardwalk Upgrade on Paihia to Opua Coastal Walkway
Replacement of a 10m long bridge and upgrading of approximately 135m of timber boardwalk that passes through a tidal mangrove wetland on the Paihia to Opua Walkway, Bay of Islands. The Contract Works include the following elements: � Setting out and general site clearance, including trimming of vegetation. � Site safet…
Source ID: NZ-GETS-25821799
Estimated value
As published by the source; may be updated by the buyer.
Scope overview
Replacement of a 10m long bridge and upgrading of approximately 135m of timber boardwalk that passes through a tidal mangrove wetland on the Paihia to Opua Walkway, Bay of Islands. The Contract Works include the following elements: � Setting out and general site clearance, including trimming of vegetation. � Site safety, path closure signage, and protective measurements. � Erosion and sediment controls.
� Removal and disposal of approximately 135m of existing timber 1.2m wide boardwalk decking, joists and bearers, and the remaining bridge piles and approaches. � Driving of four new timber bridge piles and installation of additional boardwalk timber piles where necessary. � Supply and installation of new timber boardwalk bearers, joists and decking for 135m of boardwalk supported on existing piles.
� Supply and installation of a 10m long x 1.2m wide glulam timber bridge with barriers on both sides. � Re-instate the existing 90mm diameter pumped sewage line onto the upgraded boardwalk and bridge. � Any necessary temporary works. � All other works indicated, described, or implied in the drawings or specifications.
Buyer & contacts
Tags & Signals
Similar tenders
Bridge Footpath Reconstruction Project on Foreshore Road in Ahipara
The Far North District Council invites qualified contractors to undertake physical works for the road bridge over Wairoa Stream on Foreshore Road in Ahipara. The project involves demolishing and removing the old footpath bridge deck section and reinstating it with precast concrete panels supplied by a nominated supplier. Temporary traffic management will be implemented on Foreshore Road to accommodate pedestrian traffic during construction.
Replacement Sylvan Suspension Bridge Construction in Mt Aspiring National Park
This procurement seeks a construction contractor to build a replacement Sylvan suspension bridge in Mt Aspiring National Park. The original bridge, damaged in 2020 floods and lost in 2023, will be replaced 500 meters upstream with a more resilient 52.9-meter span structure. The project includes all establishment, construction, and disestablishment works according to approved design specifications.
Swingbridge Construction and Track Development at Bedford Creek Rees-Dart Track
This tender involves constructing a 33.6-meter swingbridge with associated site works at Bedford Creek along the Rees-Dart Track. The project includes building approximately 100 meters of new track to Easy Tramping Track standards and demolishing the existing bridge. A mandatory pre-tender meeting is required for all bidders to participate in the tender process.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.