Regional Council Seeks Contractor for Pedestrian Bridge Replacement Project
Greater Wellington Regional Council (GWRC) is seeking RFP�s from suitably experienced and qualified providers to replace an existing 35 year old pedestrian Pakuratahi Forks swingbridge at the Kaitoke Regional Park in the Wellington region. The new bridge is designed to improve accessibility for all users � with wider d…
Source ID: NZ-GETS-22329443
Scope overview
Greater Wellington Regional Council (GWRC) is seeking RFP�s from suitably experienced and qualified providers to replace an existing 35 year old pedestrian Pakuratahi Forks swingbridge at the Kaitoke Regional Park in the Wellington region. The new bridge is designed to improve accessibility for all users � with wider deck clearances for a heavier load capacity, with easier access grades.
The construction services contract include but not limited to the following; � Demolition and disposal of the existing bridge (with the exception of the deadman supports) � Replacing the existing 72m long swing bridge with a 65m long suspension bridge to the engineer�s design/specification Please do NOT reply to this notice, but if you have questions please direct them to us via GETS Please register for the site visit.
Buyer & contacts
Tags & Signals
Similar tenders
Bridge Footpath Reconstruction Project on Foreshore Road in Ahipara
The Far North District Council invites qualified contractors to undertake physical works for the road bridge over Wairoa Stream on Foreshore Road in Ahipara. The project involves demolishing and removing the old footpath bridge deck section and reinstating it with precast concrete panels supplied by a nominated supplier. Temporary traffic management will be implemented on Foreshore Road to accommodate pedestrian traffic during construction.
Replacement Sylvan Suspension Bridge Construction in Mt Aspiring National Park
This procurement seeks a construction contractor to build a replacement Sylvan suspension bridge in Mt Aspiring National Park. The original bridge, damaged in 2020 floods and lost in 2023, will be replaced 500 meters upstream with a more resilient 52.9-meter span structure. The project includes all establishment, construction, and disestablishment works according to approved design specifications.
Swingbridge Construction and Track Development at Bedford Creek Rees-Dart Track
This tender involves constructing a 33.6-meter swingbridge with associated site works at Bedford Creek along the Rees-Dart Track. The project includes building approximately 100 meters of new track to Easy Tramping Track standards and demolishing the existing bridge. A mandatory pre-tender meeting is required for all bidders to participate in the tender process.
Unlock the full IndexBox Tenders workspace
Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.