Public tender

Air Force Seeks Information on Minuteman III Missile Component Replacement

This is one of more than 100,000 active tenders available on IndexBox Tenders. Get full access to detailed descriptions, workspace tools, AI recommendations, and expert support to help you work with this opportunity and thousands more.

Source ID: f4477fc4a96343359de5855c690b1b2f

openUnited States

Scope overview

-------- ATTENTION // INDUSTRY DAY REPORT AND Q&A ADDDED AS ATTACHMENTS FOR YOUR VIEWING. NO RESPONSE REQUIRED. MORE INFO TO COME.

--------- 1/21/2026 AGENCY/ORGANIZATION: Department of the Air Force, Air Force Materiel Command, AFNWC/NIMT WEAPON SYSTEM: Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) IPT: Ground Mechanical RFI PURPOSE: This RFI provides notice that the PTT2 program team is currently evaluating the availability and manufacturability of a form, fit, and function replacement.

The form, fit, function PTT2 replacement must meet the requirements in Attachment 1. PTT2 System Requirements Document . NOTICE: This notification is for market research purposes only to identify potential contractors who have the skills, experience, and knowledge required to successfully complete this effort for the PTT2 effort and is not to be construed as a solicitation.

The issuance of this RFI and responses thereto do not imply a commitment to release a solicitation. A determination by the Government not to compete any or all portions of the work discussed in this RFI rests solely within the discretion of the Government. The Government will not pay for time, effort, materials, or any other costs that arise as a consequence of responding or providing information related to this RFI.

Expand full description

The purpose of this Sources Sought Synopsis is to conduct market research to determine if responsible sources exist and if this effort can be competitive and/or a total Small Business Set-Aside. The proposed North American Industry Classification Systems (NAICS) Code is intended to be 336212 or 336999 which have a corresponding size standard of 1,000 or fewer employees.

The Government will use this information to determine the best acquisition strategy for this procurement. The Government is interested in all small business, to include 8(a), Service-Disabled Veteran-Owned, historically underutilized business zone (Hubzone), and Women-Owned small business concerns. BACKGROUND: The Air Force’s (AF) fleet of PTT must support the MMIII LGM-30G ICBM until the end of its operational life.

However, the existing challenge of parts obsolescence poses a significant obstacle to providing seamless support. Additionally, a scarcity of spare parts, some entirely unobtainable, coupled with substantial engineering updates required by the Technical Data Package (TDP), further complicates the situation.

Given these considerations, the AF aims to develop a new design, create a new TDP, and ultimately increase the PTT fleet. Procurement of five PTT2, including one to two PTT2 during the Engineering, Manufacturing, and Development (EMD) phase, will be required. During Production, the AF expects to procure the remaining three or four PTT2s for a total of five.

PTT DESCRIPTION: The PTT is a trailer that provides protection and transportation of PSREs housed within a PSRE Shipping Container. The PTT is used to transport the PSRE(s) to various storage and operational locations. The PTT provides a transportation platform that limits excessive shock and vibration to the PSRE assembly.

It also provides a temperature-controlled environment designed to keep the PSRE within its required temperature range during transportation. The Environmental Control Unit provides the required temperature control by use of an on-board diesel fueled generator and a closed loop Heating, Ventilation, and Air Conditioning unit.

INFORMATION SOUGHT: Detail how your company plans for and mitigates discrete risks related to cost, schedule, and technical ability. Detail examples, from previous contracts, of how your company has planned for and mitigated issues involving the procurement of items with long-lead times. Using NAICS code 336212, detail whether your business meets the small business classification.

At what stages in the manufacturing process would you recommend Government Mandatory Inspection Points or Defense Contract Management Agency (DCMA) inspection points? Use previous contracts as examples (include applicable contract number(s)). Indicate years of experience for each phase of the Department of Defense acquisitions process (i.e., Technology Maturation & Risk Reduction, EMD, and Production & Deployment).

Provide expected schedule durations starting at contract award through qualification testing and delivery; include all engineering gates and milestones one could reasonably expect for the PTT2 effort.

Provide an estimate cost range as a Rough Order of Magnitude (ROM) from contract award through qualification testing and delivery; including individual ROM pricing for: Engineering and design Testing Production Per unit cost (tiered pricing if applicable) Please identify expectations for testing locations for requirements assumed to be verified by test based on the attached Source Requirements Document (SRD) (i.e., what would you do in house vs.

at another facility). List experience with environmental (e.g., rain, hot/cold, sunshine, etc.) testing. List experience with shock and vibration testing for vehicles. Share the mitigation strategy for managing intellectual property, including drawings, welding standards, specifications, etc., as technology matures?

If awarded, what would your company expect the team size to be throughout the PTT2 contract (e.g., engineers, program managers, welding staff, certified weld inspectors, electricians, etc.)?

RESPONSES: Responsible and capable sources may identify their interest by providing a white-paper capability statement (limited to 10 pages) with sufficient information to substantiate that respondents can successfully perform all requirements. Responses shall be submitted using the provided template ( PTT2 Response Template 2 ) additional information, if required, shall be included after template as appendices.

Interested parties should make an earnest effort to thoroughly answer the Government’s questions. Please see the RFI question set. Government will consider responses to one or all purposes depending on company’s capability.

ELIGIBILITY REQUIREMENT: Distribution of the PTT2’s Statement of Work and SRD are limited to contractors with a DD 2345 certified by the Defense Logistics Information Service, Joint Certification Program (1-877-352-2255) who have a legitimate business purpose. As such, these Attachments cannot be provided to a contractor without a certification.

Contractors who would like to become certified can find the form and instructions at: https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx. This RFI is issued solely for informational and planning purposes. No funds are available to fund the information requested.

The information in this notice is current as of the publication date but is subject to change and is not binding to the Government. Oral submissions of information are not acceptable.

For access to the attachments, your response advising if the requirements stated above can be met, and all questions related to the above please email to the following addresses: kyle.andersen@us.af.mil and torrey.boggs.2@us.af.mil Submit the following information: Company Name and Address Cage Code Unique Identifier Company business size by North American Industry Classification (NAIC) code Small Business Type (s), if applicable Provide a response, including any recommendations and/or comments Point of Contact for questions and/or clarification Telephone Number and email address Web Page URL Teaming Partners (if applicable) Determination of Adequacy of your accounting system by DCMA and/or DCAA for Cost Type Contracts.

ATTACHMENTS / LINKS: Attachment 1. General Requirements PTT2 PTT2 Response Template PTT2 Statement of Work edit: limit adjusted to 10 pages Q&A: Question 1: Is this a new requirement? Or is there an incumbent contract/contractor currently performing the services? Would you be able to share the contract details for reference?

Answer 1: The PTT2 acquisition will be a new design and manufacturing effort to procure supplies not services, therefore there is no incumbent contractor performing services related to this acquisition.

While this is not a new requirement in terms of the Minuteman III Weapons System, as an existing (i.e., legacy) fleet of PTTs exists, procurement of this new fleet will include new technical data package development and PTT2 manufacturing; these will mirror the legacy PTTs in terms of form, fit, and function. The legacy fleet was procured in 2004 and there has been no involvement from the OEM since procurement.

Sustaining maintenance/repairs over the past 21 years has been accomplished at the depot-level, as defined in Title 10 USC 2460, consequently there are no contracts available for reference.

Statusopen
CategoryOther
CountryUnited States
Publish dateJan 21, 2026
Submission deadlineJan 31, 2025
Estimated value
Notice typetender_notice
Sourceus-sam-opportunities
BuyerDEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE MATERIEL COMMAND.AIR FORCE NUCLEAR WEAPON CENTER.INTERCONTINENTAL BALLISTIC MISSILE.FA8214 AFNWC PZBB
Buyer websitehttps://sam.gov/
CityNIBLEY

Buyer & contacts

Contacts available
3 fields shown publicly. Subscribe to unlock workspace tools (export, alerts, and buyer history).
Unlock details
Contact name
Torrey BoggsUnlock export & alerts
Email
torrey.boggs.2@us.af.milUnlock export & alerts
Organization
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE MATERIEL COMMAND.AIR FORCE NUCLEAR WEAPON CENTER.INTERCONTINENTAL BALLISTIC MISSILE.FA8214 AFNWC PZBBUnlock export & alerts

Tags & Signals

Minuteman IIIICBMmissile componentPTT2 programAir Force Materiel Commandform fit function replacementmarket researchdefense contracting

Similar tenders

United StatesOtheropen

Air Force Seeks Information for Minuteman III Payload Transporter Replacement Production

The Department of the Air Force is conducting market research for potential contractors capable of producing a replacement Payload Transporter for the Minuteman III Intercontinental Ballistic Missile system. This Request for Information aims to assess industry availability and manufacturability of a form, fit, and function production item. The notice does not constitute a solicitation and no commitment to issue a future contract is implied.

Published: Feb 10, 2026Deadline: Mar 12, 2026ID: fb28e809d447418386c86ea8e1d44204
Spainclosed

Agricultural Transformation Services Contract Tender Announcement

The public tender TSA0080249-707 has been published by the Agrarian Transformation Company TRAGSA. The procurement involves agricultural services with a budget of 33,340 euros. The current status of this tender is resolved.

Published: Feb 11, 2026Deadline: Jan 27, 2026ID: ES-PLACSP-19008324
€33,340
MalaysiaOtheropen

Grass Cutting Works at Bako Drainage Scheme for 2026

This tender involves proposed grass cutting and vegetation maintenance works at the Bako Drainage Scheme in Kuching District, Sarawak. The project is scheduled for implementation during the year 2026 as part of ongoing drainage system maintenance. The works aim to ensure proper drainage functionality and environmental management in the specified area.

Deadline: Feb 11, 2026ID: MY-DID-SARAWAK-a1c592d8a3e73a
Start your pilot

Unlock the full IndexBox Tenders workspace

Get hourly updates across 100k+ opportunities, AI recommendations, and one-click autopilot workflows. Zero obligation.

Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.