Structural Engineering Services for Seismic Assessment of Historic Government Building
Heritage New Zealand Pouhere Taonga (HNZPT) requests that you prepare a proposal (RFP which includes time schedules) for structural engineering services, that will include providing a detailed seismic assessment (DSA) of the Old Government Building (OGB) and retrofit concept and detailed design. Please refer to the att…
Source ID: NZ-GETS-26683263
Scope overview
Heritage New Zealand Pouhere Taonga (HNZPT) requests that you prepare a proposal (RFP which includes time schedules) for structural engineering services, that will include providing a detailed seismic assessment (DSA) of the Old Government Building (OGB) and retrofit concept and detailed design.
Please refer to the attached full RFP, sections from the draft conservation plan, floorplans (2013), proposed refurbishment plans (1994) and Review of earthquake resistance capacity (2017) when preparing the proposal.
The structural engineering component to this project will comprise of seven elements of work: - Element 1: Reviewing the draft briefs for the Geotechnical Assessment (GTA) and Seismological Assessment (SA). - Element 2: Reviewing the draft GTA, SA and Timber Technology Assessment (TTA) that will be carried out by others.
- Element 3: Establish and maintain regular communication/consultation with the HNZPT technical peer reviewer. You will be expected to provide updates, preliminary modelling and analysis and progress drafts of the DSA and concept (if required). - Element 4: DSA that is the primary subject of this request. Refer Project Scope section of this RFP.
- Element 5: Technical support for a review by HNZPT of the reporting on the completed modelling and initial analysis, and then the DSA. This review process is to determine the extent, if any, of proposed structural retrofit to be carried out on the building. - Element 6: A concept design for any agreed retrofit works that is the subject of this request. Retrofit works may or may not be required.
- Element 7: A detailed design to follow the concept design. Where Element 6 does not proceed neither will Element 7. The preparation of the DSA will be informed by a GTA and SA and TTA that will be commissioned by HNZPT. On completion of elements 1-5 and particularly HNZPT review of the preliminary report on the DSA, a decision will be made on whether to progress to concept design and from here detailed design.
It is therefore requested that a quote is provided with the proposal for the fees for elements 1-5 only. A quote will be requested if HNZPT decides to proceed to design for elements 6 and 7. The acceptance of the RFP for this work forms a commitment to engage the structural engineer for design work following the analysis, subject to satisfactory performance.
The design work will be subject to programme and budget allocation and may require staging.
Buyer & contacts
Tags & Signals
Similar tenders
Government Procurement Tender Announcement from Panama
A public procurement tender has been announced by a government department in Panama. The tender is currently active and open for participation. The purchasing unit responsible for this procurement process is the Department of Purchases.
Early Childhood Education Services for Comprehensive Infant Care
This tender seeks providers to deliver early childhood education services within the framework of comprehensive infant care. Services must align with technical manuals, operational guides, and ICBF-established guidelines for early childhood attention. The initiative supports the national policy for integral development of children from birth onward.
Independent Contractor Services for Administrative Support in Educational Institutions
The ITM University Institution seeks independent contractors to provide administrative support services for educational institutions. This procurement is part of the implementation of Interadministrative Contract No. 4600103668 of 2025 between Medellín's Special District of Science, Technology and Innovation, the Education Secretariat, and ITM. The services require contractors to work independently without employment relationship, assuming their own risks and responsibilities.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.