Christchurch City Council Flood Mitigation Optimization Project
This request for quotation (RFQ) is issued by Christchurch City Council. Scope Outline Optimisation of the mitigation of downstream flooding in the Heathcote River by control of four storm water basins at Wigram, Cashmere-Worsleys, Eastman-Sutherlands and Curletts using water level indication downstream:
Source ID: NZ-GETS-22787876
Scope overview
This request for quotation (RFQ) is issued by Christchurch City Council. Scope Outline Optimisation of the mitigation of downstream flooding in the Heathcote River by control of four storm water basins at Wigram, Cashmere-Worsleys, Eastman-Sutherlands and Curletts using water level indication downstream:
Buyer & contacts
Tags & Signals
Similar tenders
Porangahau Road Resilience and Flood Mitigation Infrastructure Upgrade Project
This project involves upgrading Porangahau Road to address flooding issues and improve resilience. Work includes raising road vertical alignment, upgrading bridges for High Productivity Motor Vehicle capacity, and addressing retaining wall risks. The contract is structured in five separable portions to provide flexibility for the Central Hawkes Bay District Council.
Stormwater Infrastructure Upgrade for Carlton Crescent Flood Mitigation
This project addresses surface water flooding affecting new residential lots in Carlton Crescent, Maraetai, by constructing new kerb and channel drainage along the east side of the road. The works include installing stormwater pipes, manholes, catchpits, and associated road improvements to redirect runoff away from properties. Additional berm shaping and grassing will provide further protection against overflow.
Tamaki Drive Cycle Route Construction Project for Auckland Waterfront
This project involves constructing a 2.3km bi-directional off-road cycleway along Quay Street and Tamaki Drive, connecting existing cycling infrastructure to the city center. The 2.8m wide cycleway will be separated from traffic by landscaping and from pedestrian paths by existing berms. Additional flood mitigation work will raise road levels in vulnerable areas to reduce storm and high tide impacts.
Keep reading for free. Pay only when you need workspace actions.
This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.