IndexBox global tender feed
Showing 584,749 tenders
Total value (USD): $38.2 TrillionFilter by geography, category, status, source, or keywords in seconds.
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for Lotsum, Shargole and Shakar Chiktan Block Part 1st
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for Lotsum, Shargole and Shakar Chiktan Block Part 1st
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for Lotsum, Shargole and Shakar Chiktan Block Part 2nd
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for Lotsum, Shargole and Shakar Chiktan Block Part 2nd
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for TSG Block, Sankoo Block, Barsoo Block and Taisuru Block. Part 1st
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for TSG Block, Sankoo Block, Barsoo Block and Taisuru Block. Part 1st
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for TSG Block, Sankoo Block, Barsoo Block and Taisuru Block. Part 2nd
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for TSG Block, Sankoo Block, Barsoo Block and Taisuru Block. Part 2nd
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for TSG Block, Sankoo Block, Barsoo Block and Taisuru Block. Part 3rd
Restoration of various khuls, canals/Ponds/Zings etc pertaining to INFC Division Kargil for TSG Block, Sankoo Block, Barsoo Block and Taisuru Block. Part 3rd
Construction of Addition / alteration of Presidential suite medical unit and allied works including raising of compound walling at Lok Niwas Leh.
Construction of Addition / alteration of Presidential suite medical unit and allied works including raising of compound walling at Lok Niwas Leh.
Conversion from single Bus arrangement to Double Bus arrangement at 66KV side of 220/66kV Khadoli substation in UT of DNHDD.
Conversion from single Bus arrangement to Double Bus arrangement at 66KV side of 220/66kV Khadoli substation in UT of DNHDD.
Shifting of 66kV tower line coming underway of Diu Airport area at Diu. (IInd Call)
Shifting of 66kV tower line coming underway of Diu Airport area at Diu. (IInd Call)
Annual Maintenance, Repair and Operation for Jawahar Navodaya Vidyalaya of 4 Clusters for the Financial Year 2026-27
Annual Maintenance, Repair and Operation for Jawahar Navodaya Vidyalaya of 4 Clusters for the Financial Year 2026-27
Setting up, Operating and Maintaining Manipur Cyber Security Operations Centre (MCSOC) for a Period of Five (5) Years in Imphal, Manipur
Setting up, Operating and Maintaining Manipur Cyber Security Operations Centre (MCSOC) for a Period of Five (5) Years in Imphal, Manipur
Providing Micro Processor Based Solid State Controller System (MBSC) for Renovation of Jowai Water Supply Scheme with Umngot River as the Source
Providing Micro Processor Based Solid State Controller System (MBSC) for Renovation of Jowai Water Supply Scheme with Umngot River as the Source
Construction of Football Playground at Botsa EAC Hqrs, Kohima District, Nagaland on EPC mode.
Construction of Football Playground at Botsa EAC Hqrs, Kohima District, Nagaland on EPC mode.
C/O LANE FROM HOUSE OF ARSHAD MEMORIAL TO HOUSE OF RAYEES AHMAD AND OTHERS AT BUL-BUL NOWGAM, BLOCK ACHABAL
C/O LANE FROM HOUSE OF ARSHAD MEMORIAL TO HOUSE OF RAYEES AHMAD AND OTHERS AT BUL-BUL NOWGAM, BLOCK ACHABAL
Extraction Off Road Transportation and then Road Transportation up to Sale Depot Jammu from Co. 11-Bani
Extraction Off Road Transportation and then Road Transportation up to Sale Depot Jammu from Co. 11-Bani
Permanent restoration of road from H/o Gh. Haider Khan to Mir Mohallah (By way of repair of drain) under UT Capex Road Sector of Capex Budget 2025-26.- 3rd Call.
Permanent restoration of road from H/o Gh. Haider Khan to Mir Mohallah (By way of repair of drain) under UT Capex Road Sector of Capex Budget rd Call.
Restoration of Link road to Mugji Colony road (By way of providing crated B/wall in km-1st Rd (25-50), road damaged due to heavy rainfall/ flash floods w.e.f 23-08-2025 to 28-08-2025, 31-08-2025 to 03-09-2025) under UT Capex Road Sector of Capex Budg
Restoration of Link road to Mugji Colony road (By way of providing crated B/wall in km-1st Rd (25-50), road damaged due to heavy rainfall/ flash floods w.e.f to , to ) under UT Capex Road Sector of Capex Budg
Restoration of Sajad Morh to Sehmat Mohalla road (By way of providing and laying River Bed Material (RBM) over road surface , road damaged due to heavy rainfall/ flash floods w.e.f 23-08-2025 to 28-08-2025, 31-08-2025 to 03-09-2025) under UT Capex
Restoration of Sajad Morh to Sehmat Mohalla road (By way of providing and laying River Bed Material (RBM) over road surface , road damaged due to heavy rainfall/ flash floods w.e.f to , to ) under UT Capex
Restoration of Kohli Morh to Jamia Masjid Sharief Gaggersullah road (By way of providing and laying River Bed Material (RBM) over road surface, road damaged due to heavy rainfall/ flash floods w.e.f 23-08-2025 to 28-08-2025, 31-08-2025 to 03-09-2025)
Restoration of Kohli Morh to Jamia Masjid Sharief Gaggersullah road (By way of providing and laying River Bed Material (RBM) over road surface, road damaged due to heavy rainfall/ flash floods w.e.f to , to )
Permanent restoration of Distt. Periphery road (By way of constt. of drain in stretches in km 1st RD 0-900) under UT Capex Road Sector of Capex Budget 2025-26.- 3rd Call.
Permanent restoration of Distt. Periphery road (By way of constt. of drain in stretches in km 1st RD 0-900) under UT Capex Road Sector of Capex Budget rd Call.
Restoration of Jaman Hara road (by way of providing pucca drain in km-1st Rd (00-50), road damaged due to heavy rainfall/ flash floods w.e.f 23-08-2025 to 28-08-2025, 31-08-2025 to 03-09-2025) under UT Capex Road Sector of Capex Budget 2025-26.- 3rd
Restoration of Jaman Hara road (by way of providing pucca drain in km-1st Rd (00-50), road damaged due to heavy rainfall/ flash floods w.e.f to , to ) under UT Capex Road Sector of Capex Budget rd