City Street Renewal Program for Lanark Street and Various Locations

Full Title: 2019 Local Street Renewal Program: Lanark St, Maurepas Cres & Various Other Locations The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Manitoba Hydro Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Aspha…

Source ID: 185-2019

Scope overview

Full Title: 2019 Local Street Renewal Program: Lanark St, Maurepas Cres & Various Other Locations The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Manitoba Hydro Funded Work.

Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Reconstruction (i) McDowell Drive – 47 McDowell Drive to Westlund Way (b) Pavement Rehabilitation (i) Mountbatten Avenue – Bower Boulevard to Shaftesbury Boulevard (ii) Maurepas Crescent – Edgeland Boulevard to Edgeland Boulevard (c) Concrete Reconstruction (i) Lanark Street – Corydon Avenue to John Brebeuf Place.

Part 2 – Manitoba Hydro Funded Work D2.3 Part 2 – Manitoba Hydro Funded Work shall consist of: (a) Street Lighting and Associated Work (i) McDowell Drive – 47 McDowell Drive to Westlund Way (ii) Lanark Street – John Brebeuf Place to Corydon Avenue.

D2.4 The City currently has no approved funding in the Capital Budget for Part 2 of the Work, but is anticipating receiving notification about funding from Manitoba Hydro by the Award Date. Part 2 of the Work is contingent upon Manitoba Hydro approving sufficient funding.

D2.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced accordingly. D2.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D2.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5.

D2.4.3 If all or any portion of Part 2 is eliminated pursuant to D2.4.1, the time periods stipulated in D20 for Substantial Performance of the Work and in D21 for Total Performance of the Work will be reduced proportionally by the Contract Administrator acting reasonably.

D2.5 The major components of the Work are as follows: (a) Asphalt Reconstruction (i) Removal of existing pavement (ii) Excavation (iii) Installation of subdrains (iv) Compaction of existing sub-grade (v) Installation of catchbasins and sewer service pipe (vi) Insulation of water services (vii) Placement of separation geotextile fabric/geogrid (viii) Installation of new light standards and street lighting cable (ix) Placement of sub-base and base course materials (x) Construction of curb and gutter utilizing slip-form paving equipment (xi) Construction of 150 mm reinforced concrete pavement approaches (xii) Adjustment of existing manholes (xiii) Placement of asphalt pavement (Type 1A 100 mm thick) (xiv) Renewal of existing sidewalk (xv) Boulevard restoration (b) Pavement Rehabilitation (i) Planing of existing asphalt pavement (Mountbatten Avenue) (ii) Renewal of miscellaneous pavement slabs (150 mm reinforced concrete pavement) (iii) Installation of pavement repair fabric at various locations (iv) Renewal of existing curb (v) Renewal of existing sidewalk (vi) Adjustment of catchbasins and manholes (vii) Installation of new catchbasins/catchpits (viii) Placement of asphalt overlay (average thickness 85 mm) (ix) Adjustment of paving stones (Mountbatten Avenue) (x) Boulevard restoration (c) Concrete Reconstruction (i) Removal of existing pavement (ii) Excavation (iii) Installation of subdrains (iv) Compaction of existing sub-grade (v) Installation of catchbasins and sewer service pipe (vi) Insulation of water services (vii) Placement of separation geotextile fabric/geogrid (viii) Placement of sub-base and base course materials (ix) Adjustment of existing manholes (x) Construction of 150 mm reinforced concrete pavement utilizing slip-form paving equipment c/w barrier curb (xi) Renewal of existing sidewalk (xii) Boulevard restoration.

Statusclosed
CategoryOther
CountryCanada
Publish dateDec 6, 2019
Submission deadlineJan 14, 2020
Estimated value
Notice typeaward_notice
Sourceca-winnipeg-bid-opportunities
BuyerWinnipeg Bid Opportunities
Buyer websitehttps://data.winnipeg.ca/
City

Buyer & contacts

Public read-only access
Contact fields are visible publicly. Use the workspace for exports, buyer tracking, and alerts.
Open workspace
Contact nameFrancisco Aguirre
Emailfaguirrepineda@winnipeg.ca
Phone204-986-3855
OrganizationWinnipeg Bid Opportunities

Tags & Signals

street renewalasphalt reconstructionpavement rehabilitationconcrete workstreet lightinginfrastructure projectroad improvementspublic works
Unlock actions

Keep reading for free. Pay only when you need workspace actions.

This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.

Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.