Brooklyn Bridge Park Building Renovation for Classrooms and Office Space
The goal of the full building renovation project at 334 Furman Street in Brooklyn Bridge Park is to introduce classroom space and renovate office areas and involves a comprehensive overhaul of an existing structure to create a modern, functional environment for both educational and professional use. The project include…
Source ID: us-nyc-city-record-procurement-20240917101
Scope overview
The goal of the full building renovation project at 334 Furman Street in Brooklyn Bridge Park is to introduce classroom space and renovate office areas and involves a comprehensive overhaul of an existing structure to create a modern, functional environment for both educational and professional use.
The project includes the transformation of existing spaces to accommodate new, state-of-the-art classrooms equipped with advanced technology and flexible layouts to support various teaching methods. Simultaneously, the office spaces will be renovated to enhance productivity, with upgraded finishes, improved lighting, and ergonomic design.
The renovation will also address infrastructure improvements, such as vertical transportation and updated electrical and HVAC systems, to support the new functions of the building. The overall objective is to create a cohesive and efficient space that meets the needs of both students and staff.
Currently, BBP along with the BBP Conservancy occupy only the first floor which is the only conditioned space in the building. The second and third floors are unoccupied, save for storage of park materials and files. The have been no infrastructure improvements made on the second and third floor in over 20 years. The third floor, just below the roof, has skylights that have been roofed over.
The cast in place structure around the skylights is spalled and reinforcement exposed and rusted. The program for the third floor calls for the reactivation of the skylights.
Additionally, the 3rd floor has cast in place concrete walls that conflict with the program and the Consultant Team will need to review the structural nature of these walls and accommodate the program for the space through the design and engineering process. BBP recently engaged Gensler Architects (Gensler) to complete concept programming and preliminary code review study for the renovation.
The study is included in this RFP as Exhibit 4. Submitted proposals should be consistent with the goals and guidelines outlined in the programming study. To the extent that a submitted proposal differs significantly from the results of this study, Respondents should submit a narrative explaining the justification for the change. Agency: Brooklyn Bridge Park Status: Solicitation
Buyer & contacts
Documents
Tags & Signals
Similar tenders
HVAC System Replacement and Building Renovation Project for Manhattan Facility
This project involves the removal and replacement of the AC-3 HVAC system serving the second and third floors, including new ductwork, air handling units, controls, and return fans. Work includes relocating lighting, ceiling devices, and sprinkler systems affected by the installation, as well as providing new lighting and mechanical equipment in the third-floor mechanical room. The contract requires compliance with special experience requirements and will be awarded through a competitive sealed bid process.
Gas Main and Riser Piping Installation Contract for Building Renovation
This contract involves installing new gas mains and riser piping systems within residential buildings, including all necessary components up to existing gas ranges. The work includes exposed piping installation in apartment kitchens and any required excavation for underground service replacement. Gas meters are excluded as they remain utility property.
Gas Main and Riser Piping Installation Contract for Building Renovation
This contract involves installing new gas mains and riser piping systems within residential buildings, including all necessary components up to existing gas ranges. The work includes exposed piping installation in apartment kitchens and any required excavation for underground service replacement. Gas meters remain utility property and are excluded from this contract scope.
Keep reading for free. Pay only when you need workspace actions.
This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.