Construction of Heating and Cooling System with Heat Pumps and Distribution Components
Neubau einer Heizungs- u. Kälteanlage, im Wesentlichen bestehend aus: •4 St. Luft/ Wasser Wärmepumpen, 98- 274 kW •1 St. Wasser/ Wasser Wärmepumpe, 65kW •1 St. Flüssigkeitskühler 23kW •22 St. Umluftkühlgeräte 3kW •2 St. autom. Druckhalteanlage •2 St. autom. Nachspeisung •1 St. Magnetitabscheider DN 150 •1 St. Magnetita…
Source ID: TED-1ef7e3dc-f73a-4e6a-a249-51f2a31ebe00
Scope overview
Neubau einer Heizungs- u. Kälteanlage, im Wesentlichen bestehend aus: •4 St. Luft/ Wasser Wärmepumpen, 98- 274 kW •1 St. Wasser/ Wasser Wärmepumpe, 65kW •1 St. Flüssigkeitskühler 23kW •22 St. Umluftkühlgeräte 3kW •2 St. autom. Druckhalteanlage •2 St. autom. Nachspeisung •1 St. Magnetitabscheider DN 150 •1 St. Magnetitabscheider DN 65 •2 St. Enthärtungsarmaturen •1 St. Pufferspeicher 3000l •1 St.
Pufferspeicher 1500l •10 St. Umwälzpumpen DN 32- 65 •175 St. Absperrarmaturen DN 15- 150 •44 St. Regelarmaturen •48 St. motorische Regelarmaturen •36 St. stat. Heizflächen •4750 m Stahlrohrleitung DN 15- 150 •1050m Stahlrohrleitung DN 15- 80 m. Beschichtung AGI Q 151
Buyer & contacts
Tags & Signals
Similar tenders
Procurement of Steel Niro Heating Pipes and Underfloor Heating Distribution System
This tender involves the supply of steel niro heating water pipes in diameters ranging from 28 mm to 76 mm, totaling 615 meters. The procurement includes two heating distributors, each with 7 outlets, and components for an underfloor heating system covering 2,900 square meters with 214 individual heating circuits. The materials are intended for installation in a comprehensive underfloor heating infrastructure.
Procurement of Heating System Components Including Boilers and Heat Pumps
This tender involves the supply of various heating system components including two 500 kW gas condensing boilers and eight 35 kW air-to-water heat pumps. The procurement also includes distribution systems, buffer tanks, circulation pumps, and approximately 800 meters of steel piping with insulation. Additional items include a 350 kW container heating system for winter construction.
Energy Center Media Connections for Ditzingen District Heating Network
The municipal utility of Ditzingen is establishing media connections for the 'Langes Land' energy center to supply the new 'Ob dem Korntaler Weg' district. The project involves civil and pipeline works to connect the center to existing district heating, electricity, water, and wastewater networks. This infrastructure will enable the operation of the heating system using electricity, pellets, ambient energy, and natural gas for peak loads.
Keep reading for free. Pay only when you need workspace actions.
This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.