Waitomo Walkway Boardwalk Replacement and Retaining Wall Construction Tender
The Director-General of the Department of Conservation (the Principal) is seeking tenders from the Combined Regional Track Panel to complete the construction works described in these Tender Documents. The Tender Documents set out the general requirements for the construction works, together with the terms and condition…
Source ID: NZ-GETS-24458060
Scope overview
The Director-General of the Department of Conservation (the Principal) is seeking tenders from the Combined Regional Track Panel to complete the construction works described in these Tender Documents. The Tender Documents set out the general requirements for the construction works, together with the terms and conditions for submitting a tender.
Contractors responding or intending to respond to this tender shall be known as tenderers. This contract is for the replacement of two sections of boardwalk with a 17m long retaining wall with tied rock fixing and 22m length barrier, located on the Waitomo Walkway immediately north of the Ruakuri Reserve carpark area.
The Contract Works include the following elements: � Removal and disposal of approximately 17m of existing boardwalk structure. � Supply and install approximately 9m of retaining wall up to 0.8m high. � Supply and install approximately 8m of retaining wall up to 2.0m high. � Supply and install approximately 22m of timber barrier to fixed retaining wall or to rock.
� Supply and installation of three new timber boxed steps. � Backfill the retaining walls and steps to form track. � Supply and spread 2 cubic metres of aggregate track surfacing.
Buyer & contacts
Tags & Signals
Similar tenders
Bridge Replacement and Boardwalk Upgrade on Paihia to Opua Coastal Walkway
This project involves replacing a 10-meter bridge and upgrading approximately 135 meters of timber boardwalk through a tidal mangrove wetland. Work includes removing existing structures, installing new timber piles and glulam bridge components, and reinstating sewage infrastructure. The project requires careful environmental management in this sensitive coastal ecosystem.
Waitonga Falls Track Boardwalk Replacement and Infrastructure Upgrades
This project involves demolishing and replacing a 318-meter boardwalk along the Waitonga Falls Track in Tongariro National Park. Additional work includes replacing an existing gantry staircase, re-leveling a gantry bridge, and constructing a retaining wall. The improvements aim to enhance visitor safety and accessibility while preserving the natural environment.
Keep reading for free. Pay only when you need workspace actions.
This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.