Monroe Harbor Advanced Maintenance Dredging Project Requirements
***Posting of Bid Abstract***Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method…
Source ID: d527c64a431c47e49db0a14a7f9be825
Scope overview
***Posting of Bid Abstract***Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted.
The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less.
The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete.
Buyer & contacts
Documents
Tags & Signals
Similar tenders
Army Corps of Engineers Seeks Shoreline Stabilization Contract for Snows Cut Waterway
The U.S. Army Corps of Engineers Wilmington District requires maintenance dredging and shoreline stabilization along Snows Cut in New Hanover County, North Carolina. The project involves stabilizing up to 7,100 feet of shoreline through vegetation clearing, bank sloping, riprap placement, and potential breakwater construction. This small business set-aside contract will be firm fixed price with electronic solicitation available in April 2026.
Dredging and Disposal Project for Houma Navigation Canal Channel
This procurement involves the removal and disposal of shoal material from the Houma Navigation Canal channel. Dredged material will be deposited at designated single-point discharge locations adjacent to the channel. The project is classified as unrestricted with an estimated value between $10 million and $25 million.
Jacksonville Harbor Channel Maintenance Dredging Project
This project involves maintenance dredging of the Jacksonville Harbor channel, divided into Base and Option A components. The Base work covers sections Bar Cut-3 through Cut-17 with disposal at the Ocean Dredged Material Disposal Site Zone C1. Option A includes dredging Cut-55 through the Lower Terminal Channel, with material placed at Bartram Island Dredge Material Management Area Cell F.
Keep reading for free. Pay only when you need workspace actions.
This record stays public. Upgrade only when you want alerts, exports, OCR packs, and autopilot workflows inside the private workspace.
Disclaimer: IndexBox Tenders does not issue, announce, or publish this tender. This information is aggregated from publicly available sources and is provided for informational purposes only. IndexBox Tenders is not affiliated with, endorsed by, or acting on behalf of the tender issuer. Users should verify all information directly with the official tender source before making any decisions or taking any action.